The EDI 843 is your quote, in a format the buyer's sourcing system can compare against everyone else's. The buyer sent an 840 Request for Quotation to you and probably to two or three competitors. Each 843 that comes back is loaded side by side, line by line, on price, lead time and terms. A quote that cannot be matched to the request, or that prices a different unit than the one asked for, tends to lose by default.
This guide covers what the 843 carries, how it pairs with the 840, every segment in a typical quote, a live example that answers the RFQ from our 840 guide, how the 843 differs from the 855, and the errors that get quotes ignored.
What Is an EDI 843?
An EDI 843 is the Response to Request for Quotation transaction set defined by ASC X12. Sellers use it to give potential buyers price, delivery schedule and other terms, normally in answer to an 840. It travels in functional group RR (the GS01 value).
Authoritative references for 843 work:
- The X12 transaction set catalog defines the 843 alongside the 840 it answers
- The Stedi X12 004010 reference for the 843 lists the segment order and usage. Unlike the 840, the 843 makes the
CTTsummary mandatory - The Defense Logistics Agency lists the 843 among its common procurement EDI transactions, and federal buyers publish implementation conventions for it
- In UN/EDIFACT the equivalent is QUOTES, answering REQOTE, both in the UN/EDIFACT directory
Who sends it? The supplier that received the 840.
Who receives it? The buyer, usually its sourcing or purchasing system.
When is it sent? After the supplier has priced the lines and checked availability, and before the due date the buyer set on the 840.
Why does it matter? Buyers that send 840s compare quotes in software. An 843 that loads cleanly gets compared; a quote sent by email instead may not.
The 843 Is an Offer, Not a Sale
An 843 binds nobody to buy. It says: here is my price and lead time if you order. The buyer can accept it, ignore it or ask for a revised quote. Nothing ships until an 850 purchase order arrives.
Two consequences for suppliers:
- Put an end date on your price. A quote with no expiry can come back months later as a PO at a price you can no longer meet. The sample below sends one in a header
DTM. Which qualifier the buyer expects is set by its guide. - Check the 850 against the 843. When the order arrives, compare its prices with the quote it came from. Differences are cheaper to fix at the 855 acknowledgment than at the 810 invoice.
How the 840 and 843 Work Together
- The 840 arrives with an RFQ number in
BQT02, the lines inPO1, and often a due date inBQT05. - Your translator returns a 997 for the
RQgroup. - You price each line, check stock and lead time, and decide on terms.
- You send the 843.
BQR02echoes the RFQ number, eachPO1echoes the buyer's line number and part number and adds your price. - The buyer returns a 997 for your
RRgroup, then compares quotes. - If you win, an 850 follows. If not, you usually hear nothing at all.
Interactive Example: Quote for Three Fastener Lines
This 843 answers the RFQ in our 840 guide: RFQ-260411, three stainless lines for a marine supply distributor. BQR echoes the RFQ number and marks the response BI (bid without exception). PER names the sales contact, ITD offers net 30 terms, and DTM*036 sets the date the quote expires. Each PO1 repeats the buyer's line, quantity and part number with a unit price. CTP repeats the price with the QTE (quote price) identifier, and line 1 adds a second CTP with a lower price at 10,000 pieces. LDT gives the lead time from PO receipt to shipment. CTT totals 3 lines and 10,200 units, and AMT*TT gives the quote total of $2,815.00 (5,000 x $0.184, plus 5,000 x $0.061, plus 200 x $7.95). All names and IDs are fictional.
Supplier 843 Quote Response
The fastener maker answers RFQ-260411: BQR echoes the RFQ number, unit prices with a CTP price break, lead times in LDT, net 30 terms, an expiry date and a $2,815.00 quote total
- Document
- 843 Response to Request for Quotation
- From / to
- CASCADEFAST → HARBORPOINT
- Segments
- 27
- Interchange date
- Nov 5, 2026
Raw EDI (X12)
Human-Readable
Interchange
Functional Group
Transaction 843
Response to Request for QuotationSegment Detail
843 Structure at a Glance
| Position | Segment | Name | Usage | Notes |
|---|---|---|---|---|
| Header | ST | Transaction Set Header | Mandatory | ST01 = 843 |
| Header | BQR | Beginning Segment for Response to Request for Quotation | Mandatory | Purpose, RFQ number, date, bid type |
| Header | CUR | Currency | Optional | Quote currency, when not the default |
| Header | REF | Reference Identification | Optional | Your quote or contract references |
| Header | PER | Administrative Communications Contact | Optional, up to 3 | Your sales contact |
| Header | FOB / ITD | F.O.B. instructions, terms of sale | Optional | Freight terms and payment terms |
| Header | DTM | Date/Time Reference | Optional, up to 10 | Quote expiry and other dates |
| Header loop | N1 / N2 / N3 / N4 | Name and address | Optional, repeats | Seller, buyer, ship-from |
| Detail loop | PO1 | Baseline Item Data | Mandatory per line | Quoted line with unit price |
| Detail loop | CTP | Pricing Information | Optional, repeats | Price type, price breaks, multipliers |
| Detail loop | PID | Product/Item Description | Optional | Item description |
| Detail loop | LDT | Lead Time | Optional | Lead time for the line |
| Summary | CTT | Transaction Totals | Mandatory | Number of lines, hash of quantities |
| Summary | AMT | Monetary Amount | Optional | Total of the quote |
| Summary | SE | Transaction Set Trailer | Mandatory | Segment count and control number |
Key Segments Explained
BQR: Beginning Segment for Response to Request for Quotation
BQR*00*RFQ-260411*20261105***BI~
| Element | Name | Example | What it means |
|---|---|---|---|
| BQR01 | Transaction Set Purpose Code | 00 | 00 original, 01 cancellation, 05 replace |
| BQR02 | Request for Quote Reference Number | RFQ-260411 | The buyer's RFQ number from BQT02, exactly as sent |
| BQR03 | Date | 20261105 | Reference date of the response |
| BQR04 / BQR05 | Date/Time Qualifier, Date | A second date, sent as a pair | |
| BQR06 | Bid Type Response Code | BI | BI bid without exception, BW bid with exception, DQ decline to quote, UQ unable to quote, AB alternate bid |
| BQR08 | Change Order Sequence Number | The revision number when you re-quote |
BQR02 is the matching key. Copy it from the 840 character for character, including prefixes and leading zeros. If you are declining, say so with DQ rather than not answering: some buyers track response rates by supplier.
ITD: Terms of Sale
ITD*01*3*****30~
ITD01 = 01 (basic terms), ITD02 = 3 (from invoice date) and ITD07 = 30 (net days) mean net 30 from invoice. Discount terms go in ITD03 to ITD05. Buyers compare terms as well as price, so send them even when they match your standard.
DTM: Quote Expiry
DTM*036*20261204~
DTM01 = 036 is the X12 Expiration qualifier, used here for the last date the quoted prices apply. Some buyers' guides name a different qualifier or put the date in BQR04/BQR05; follow theirs.
PO1: Quoted Line
PO1*1*5000*EA*0.184*PE*BP*HP-SS316-HB0516*VP*CF-316-HX0516~
| Element | Name | Example | What it means |
|---|---|---|---|
| PO101 | Assigned Identification | 1 | The buyer's line number from the 840 |
| PO102 | Quantity | 5000 | The quantity you are quoting |
| PO103 | Unit or Basis for Measurement Code | EA | The unit of the quantity |
| PO104 | Unit Price | 0.184 | Your price per unit in PO105 |
| PO105 | Basis of Unit Price Code | PE | PE price per each |
| PO106 / PO107 | Product ID Qualifier, ID | BP, HP-SS316-HB0516 | The buyer's part number, echoed |
| PO108 / PO109 | Product ID Qualifier, ID | VP, CF-316-HX0516 | Your part number |
Echo the buyer's line number, unit and part number exactly. If you quote a different unit or pack, say so on the line and send a BW (bid with exception) in BQR06, so the buyer's comparison does not treat a box price as an each price.
CTP: Pricing Information
CTP**QTE*0.184*5000*EA~
CTP**QTE*0.172*10000*EA~
| Element | Name | Example | What it means |
|---|---|---|---|
| CTP01 | Class of Trade Code | The class of trade, when prices differ by it | |
| CTP02 | Price Identifier Code | QTE | QTE quote price. Others include CON contract and PRP promotional |
| CTP03 | Unit Price | 0.172 | The price |
| CTP04 / CTP05 | Quantity, Unit | 10000, EA | The quantity and unit the price applies to |
| CTP06 / CTP07 | Price Multiplier Qualifier, Multiplier | A discount factor, such as 0.90 for 10 percent off |
CTP repeats, so one line can carry several prices. In this sample the second CTP offers a lower price at a higher quantity. How a buyer reads a quantity in CTP04 (a break point or simply the quoted quantity) varies, so agree it before you send price breaks.
LDT: Lead Time
LDT*AE*10*DA~
| Element | Name | Example | What it means |
|---|---|---|---|
| LDT01 | Lead Time Code | AE | AE from date of PO receipt to shipment. AF runs to delivery instead |
| LDT02 | Quantity | 10 | The number of time units |
| LDT03 | Unit of Time Period | DA | DA calendar days, WK weeks |
Lead time decides many quotes as often as price does. Quote it from the event the buyer cares about: AE (to shipment) and AF (to delivery) differ by the transit time.
CTT and AMT: Totals
CTT*3*10200~
AMT*TT*2815.00~
CTT01 is the number of PO1 lines and CTT02 the sum of quoted quantities. AMT01 = TT (Total Transaction Amount) carries the quote total. Calculate both from the lines, never type them.
EDI 843 vs 840, 855 and 850
| Document | Sent by | Sent to | Purpose |
|---|---|---|---|
| 840 Request for Quotation | Buyer | Supplier | What would these items cost? |
| 843 Response to RFQ | Supplier | Buyer | My price, lead time and terms, if you order |
| 850 Purchase Order | Buyer | Supplier | Ship these items; a commitment to buy |
| 855 PO Acknowledgment | Supplier | Buyer | I accept, change or reject your order, line by line |
The 843 and the 855 are both supplier replies, but to different questions. The 843 answers "what would it cost?" before any order exists. The 855 answers "will you fill this order?" after the 850 arrives. A supplier that confuses them either quotes against an order or acknowledges an order that was never placed.
Common 843 Errors and How to Prevent Them
| Error | What happens | Prevention |
|---|---|---|
BQR02 does not match the RFQ | Quote cannot be matched and is ignored | Copy BQT02 from the 840 exactly |
| Line numbers renumbered | Prices land on the wrong lines | Echo PO101 from the 840 |
| Different unit quoted silently | A box price is compared with each prices | Quote the requested unit, or flag the exception with BW |
| No expiry date | An old price comes back as a PO months later | Send the expiry in the field the buyer's guide names |
| Lead time missing | Buyer assumes the worst, or calls | Send LDT on every line |
| Quote sent after the due date | Not compared at all | Track BQT05 from the 840 and alert before it passes |
CTT missing | Syntax rejection, since CTT is mandatory in the 843 | Always generate CTT from the lines |
| Totals typed by hand | Total disagrees with the lines | Calculate AMT from PO102 x PO104 |
843 Implementation Checklist
- Confirm the buyer's 843 guide, X12 release and
GS01=RR - Map
BQT02toBQR02, and the 840's line numbers, units and part numbers to yourPO1 - Agree how to send price breaks (
CTP) and lead times (LDT) - Agree where the quote expiry goes and which qualifier to use
- Decide how you decline (
DQ,UQ) and how you re-quote (BQR01=05,BQR08) - Send
CTTon every 843, and anAMTtotal if the buyer wants one - Store each 843 so you can check the prices on any 850 that follows
- Test an original quote, a decline, a quote with exceptions and a revised quote
Where OrderSync Fits
Quotes are the step before the order. When the buyer accepts, the purchase order may arrive as an EDI 850, a PDF, an email or a spreadsheet. OrderSync reads it in any of those formats, matches customers, items and units to your catalog, and outputs valid X12 or ERP data, so the order enters your system the way it was priced.
Paste any 843 into the free EDI inspector to see it parsed segment by segment with a plain-English summary. If you supply industrial or MRO customers, see EDI for industrial supply, or book a 15-minute walkthrough to see your own orders processed.
Frequently Asked Questions
What is an EDI 843?
The EDI 843 Response to Request for Quotation is an X12 transaction a supplier sends to answer a buyer's 840. It echoes the RFQ number and gives a price, lead time and terms for each requested line. It travels in functional group RR.
What is the difference between an EDI 840 and an EDI 843?
The 840 is the buyer's request for a quote. The 843 is the supplier's answer, with prices, lead times and terms. They are two halves of one exchange, matched on the RFQ number.
Does an EDI 843 commit the buyer to purchase?
No. The 843 is an offer. Nothing is ordered until the buyer sends an 850 purchase order. Suppliers usually include an expiry date so an old price cannot be accepted months later.
How do I match an 843 back to the original 840?
On the RFQ number. The buyer sends it in BQT02 of the 840 and the supplier echoes it in BQR02 of the 843. Line numbers in PO101 should also match the 840 so each price lands on the right line.
What is the difference between an EDI 843 and an EDI 855?
The 843 answers a request for quotation before any order exists. The 855 acknowledges a purchase order that has been placed, accepting, changing or rejecting its lines. One is a price offer, the other is an order confirmation.
How do I decline an RFQ with an 843?
Send an 843 with BQR06 set to DQ (decline to quote) or UQ (unable to quote), echoing the RFQ number in BQR02. Check the buyer's guide, since some want a reason or want the lines included.
Where does the lead time go in an EDI 843?
In the LDT segment inside each line. LDT01 says what the lead time measures, such as AE from PO receipt to shipment, LDT02 is the number and LDT03 the unit, such as DA for calendar days.
Is the EDI 843 the same as EDIFACT QUOTES?
They do the same job. The 843 is the X12 transaction set, and QUOTES is the UN/EDIFACT quote message that answers a REQOTE. The segment structures differ.