EDI 862 Shipping Schedule: Near-Term Release Guide

How the EDI 862 Shipping Schedule works: how it supplements the 830, BSS, FST, JIT and SHP segments, a live example, 862 vs 830 and 866, and common errors.

The EDI 862 Shipping Schedule is how a buyer turns a longer-range 830 forecast into exact, dated ship instructions for the next few days. It does not set prices or create a new agreement. It points back at a blanket purchase order and the planning schedule already in play, then says: deliver these quantities, to this dock, on these days and at these times. In just-in-time manufacturing, the 862 is the document that keeps an assembly line fed.

This guide covers what the 862 contains, how it differs from the 830 and 866, a live example you can open segment by segment, every segment you will map (BSS, LIN, UIT, FST, JIT, SHP), and the mistakes that cause premium freight and line-down calls.

What Is an EDI 862?

An EDI 862 is the Shipping Schedule transaction set defined by the ASC X12 standards body, used by a customer to give a supplier precise shipping schedule requirements. The X12 definition says it is meant to supplement the 830 Planning Schedule: it can supersede certain shipping and delivery information from a previous 830, but it does not replace the 830, and it "shall not be used to authorize labor, materials or other resources." Because it can be sent far more often than the 830, it supports just-in-time manufacturing.

Authoritative references for 862 work:

Who sends it? The buyer (an OEM, assembler or other manufacturer), often from the individual plant rather than the central planning group.

When is it sent? On a short cadence, commonly daily and sometimes more than once a day, covering a horizon of days to a couple of weeks.

Why does it matter? The 862 is the call-off. Reading it wrong, or shipping to a stale schedule, leads directly to premium freight, a line stoppage, or parts the plant did not ask for.

EDI 862 vs EDI 830: Plan vs Ship

The 830 and 862 work as a pair, and confusing them is the most common mistake on the supplier side. For the longer comparison, see EDI 830 vs 862.

EDI 830 Planning ScheduleEDI 862 Shipping Schedule
PurposeRolling demand: forecast plus firm releasesExact near-term ship or delivery requirements
HorizonWeeks to monthsDays to a couple of weeks
Carries forecast?Yes, firm and planning bucketsFirm requirements; some partners add a short look-ahead
Authorizes material or labor?Yes, through ATHNo, by definition
Time of day?RarelyOften, through JIT segments
CadenceWeekly or dailyDaily, sometimes intra-day
Beginning segmentBFRBSS
EDIFACT equivalentDELFORDELJIT

The 830 lets a supplier buy material and reserve capacity. The 862 then says which of that demand to deliver now. Where the two disagree inside the 862's horizon, the 862 is the instruction for that window. If an 862 asks for more than the 830 ever authorized, treat it as a question for the buyer's scheduler before you ship.

When parts must also arrive in build order, the 866 Production Sequence adds the sequence on top of the 862's quantities and times.

Interactive Example: OEM Shipping Schedule (862, BSS01 05)

The assembly plant from our 830 example sends a replacement shipping schedule (BSS01 05) for November 10 to 13. BSS07 is release REL-0458, BSS08 points to the 830 it supplements (SCH-2026-W45) and BSS10 is the blanket PO. Each of the four days has a firm (C) discrete (D) requirement of 400. The first two days split into two JIT deliveries: 200 at 06:00 and 200 at 14:00. REF*DK names the dock, and SHP reports the last receipt and the cumulative received.

Use the Plain English tab for a readable summary, or click any segment to break it down element by element.

Live exampleOEM CustomerEDI 862

OEM 862 Shipping Schedule

Firm daily delivery requirements for the same part against the 830 (BSS08) and blanket PO (BSS10): four discrete firm FST days, JIT delivery times on the first two, the dock in REF, and last receipt and cumulative received in SHP

Document
862 Shipping Schedule
From / to
NORTHGATEAUTO → CEDARVALLEY
Segments
24
Party (MI)
NORTHGATE ASSEMBLY PLANT 2
Supplier
CEDAR VALLEY MOLDING
Ship To
NORTHGATE ASSEMBLY PLANT 2
Interchange date
Nov 6, 2026

Raw EDI (X12)

1
ISA*00* *00* *ZZ*NORTHGATEAUTO *ZZ*CEDARVALLEY *261106*0545*U*00401*000000862*0*P*:~
2
GS*SS*NORTHGATEAUTO*CEDARVALLEY*20261106*0545*862*X*004010~
3
ST*862*0001~
4
BSS*05*SS-20261106-01*20261106*DL*20261110*20261113*REL-0458*SCH-2026-W45**4500188421*A~
5
N1*MI*NORTHGATE ASSEMBLY PLANT 2*92*PLT02~
6
N1*SU*CEDAR VALLEY MOLDING*92*30130~
7
N1*ST*NORTHGATE ASSEMBLY PLANT 2*92*DOCK-7~
8
LIN**BP*430-00012-A*VP*SHROUD100~
9
UIT*EA~
10
REF*DK*DOCK 7~
11
FST*400*C*D*20261110~
12
JIT*200*0600~
13
JIT*200*1400~
14
FST*400*C*D*20261111~
15
JIT*200*0600~
16
JIT*200*1400~
17
FST*400*C*D*20261112~
18
FST*400*C*D*20261113~
19
SHP*01*400*050*20261105~
20
SHP*02*42200*051*20260105**20261105~
21
CTT*1*1600~
22
SE*20*0001~
23
GE*1*862~
24
IEA*1*000000862~

Human-Readable

Interchange

Sender ID(ZZ)NORTHGATEAUTO
Receiver ID(ZZ)CEDARVALLEY
Date261106
Time0545
Standards IDU
Version00401
Control Number000000862
Acknowledgment RequestedNo
UsageProduction
Included Groups (IEA01)1

Functional Group

Functional IDSSSS
SenderNORTHGATEAUTO
ReceiverCEDARVALLEY
Date20261106
Time0545
Control Number862
Agency CodeX
Version004010
Transactions1
Reported Transaction Count (GE01)1

Transaction 862

Shipping Schedule
Transaction Type862
Control Number0001
Segments, ST to SE20
Count in SE0120 (matches)

Segment Detail

BSSBeginning Segment for Shipping Schedule/Production Sequence
BSS01Transaction Set Purpose Code05
BSS02Reference IdentificationSS-20261106-01
BSS03Date20261106
BSS04Schedule Type QualifierDL
BSS05Horizon Start Date20261110
BSS06Horizon End Date20261113
BSS07Release NumberREL-0458
BSS08Forecast ReferenceSCH-2026-W45
BSS10Purchase Order Number4500188421
BSS11Schedule Quantity QualifierA
N1Party Identification
N101Entity CodeMI
N102NameNORTHGATE ASSEMBLY PLANT 2
N103ID Qualifier92
N104ID CodePLT02
N1Party Identification
N101Entity CodeSU
N102NameCEDAR VALLEY MOLDING
N103ID Qualifier92
N104ID Code30130
N1Party Identification
N101Entity CodeST
N102NameNORTHGATE ASSEMBLY PLANT 2
N103ID Qualifier92
N104ID CodeDOCK-7
LINItem Identification
LIN02ID QualifierBP
LIN03Product ID430-00012-A
LIN04ID QualifierVP
LIN05Product IDSHROUD100
UITUnit Detail
UIT01Unit of MeasureEA
REFReference Identification
REF01QualifierDK
REF02Reference IDDOCK 7
FSTForecast Schedule
FST01Quantity400
FST02Forecast QualifierC
FST03Forecast Timing QualifierD
FST04Date20261110
JITJust-In-Time Schedule
JIT01Quantity200
JIT02Time0600
JITJust-In-Time Schedule
JIT01Quantity200
JIT02Time1400
FSTForecast Schedule
FST01Quantity400
FST02Forecast QualifierC
FST03Forecast Timing QualifierD
FST04Date20261111
JITJust-In-Time Schedule
JIT01Quantity200
JIT02Time0600
JITJust-In-Time Schedule
JIT01Quantity200
JIT02Time1400
FSTForecast Schedule
FST01Quantity400
FST02Forecast QualifierC
FST03Forecast Timing QualifierD
FST04Date20261112
FSTForecast Schedule
FST01Quantity400
FST02Forecast QualifierC
FST03Forecast Timing QualifierD
FST04Date20261113
SHPShipped/Received Information
SHP01Quantity Qualifier01
SHP02Quantity400
SHP03Date/Time Qualifier050
SHP04Date (or Cumulative Start Date)20261105
SHPShipped/Received Information
SHP01Quantity Qualifier02
SHP02Quantity42200
SHP03Date/Time Qualifier051
SHP04Date (or Cumulative Start Date)20260105
SHP06Cumulative End Date20261105
CTTTransaction Totals
CTT01Line Item Count1
CTT02Hash Total1600
1 functional group1 transactionControl #000000862Valid

862 Structure at a Glance

AreaSegmentNameUsageNotes
HeaderSTTransaction Set HeaderMandatoryST01 = 862
HeaderBSSBeginning Segment for Shipping ScheduleMandatoryPurpose, schedule number, date, date type, horizon, references
HeaderDTMDate/Time ReferenceOptionalHeader dates
Header N1 loopN1 to N4, REF, PER, FOBPartiesOptionalIssuer (MI), supplier (SU), ship-to (ST)
LIN loopLINItem IdentificationMandatory, repeatsBuyer part (BP), vendor part (VP)
LIN loopUITUnit DetailMandatoryUnit of measure
LIN loopPKG, PO4PackagingOptionalContainer requirements
LIN loopPRS, QTY, REF, PERStatus, quantities, references, contactOptionalDock, line feed or scheduler details
LIN loopSDPShip/Delivery PatternOptionalA routine day and time pattern
FST loopFSTForecast ScheduleRepeats, up to 100Quantity, firm qualifier, timing, date
FST loopDTM, SDQDates, destination quantitiesOptionalExtra dates or split by destination
JIT loopJITJust-In-Time ScheduleOptional, up to 96 per FSTQuantity at a time of day
SHP loopSHPShipped/Received InformationOptional, up to 10Last receipt and cumulative quantities
LIN loopTD1, TD3, TD5Carrier detailsOptionalRouting instructions
SummaryCTTTransaction TotalsOptionalNumber of LIN items, sum of FST quantities
SummarySETransaction Set TrailerMandatorySegment count and control number

UIT is mandatory in every 862 LIN loop, which is a difference from the 830, where it is optional.

Key Segments Explained

BSS: Beginning Segment for Shipping Schedule

BSS*05*SS-20261106-01*20261106*DL*20261110*20261113*REL-0458*SCH-2026-W45**4500188421*A~
ElementNameReqExampleMeaning
BSS01Transaction Set Purpose CodeM0500 original, 05 replace, 04 change, 01 cancellation
BSS02Reference IdentificationMSS-20261106-01The schedule's document number
BSS03DateM20261106Date of this schedule
BSS04Schedule Type QualifierMDLDL delivery dates, SH shipment dates, KB kanban signal
BSS05DateM20261110Horizon start
BSS06DateM20261113Horizon end
BSS07Release NumberCREL-0458A release against the blanket PO
BSS08Reference IdentificationCSCH-2026-W45The forecast number, which ties the 862 to its 830
BSS09Contract NumberOContract reference
BSS10Purchase Order NumberO4500188421The blanket PO
BSS11Schedule Quantity QualifierOAA discrete, C cumulative

At least one of BSS07 and BSS08 must be present. Your 856 ASN usually has to quote the release or PO from here, so map both.

LIN and UIT

LIN**BP*430-00012-A*VP*SHROUD100~
UIT*EA~

LIN carries the buyer's part number (BP) and the vendor's (VP), the same pair as in the 830. Map on the buyer's part number, because that is what the plant's receiving system matches against. UIT is the unit of measure for every quantity in the loop.

FST: Forecast Schedule

FST*400*C*D*20261110~
ElementNameExampleMeaning
FST01Quantity400Units required
FST02Forecast QualifierCC firm, A immediate
FST03Forecast Timing QualifierDD discrete date, C daily, W weekly, F flexible interval
FST04Date20261110The ship or delivery date, per BSS04
FST06, FST07Date/Time Qualifier, TimeA single time for the requirement

The same FST segment and code lists as the 830 apply. In an 862 the near-term quantities are normally firm. If your partner also sends planning (D) buckets for a short look-ahead, treat them exactly as you would on an 830: information, not a release.

JIT: Just-In-Time Schedule

JIT*200*0600~
JIT*200*1400~

JIT follows an FST and splits its quantity by time of day: JIT01 is the quantity and JIT02 the time on a 24-hour clock. Here the 400 for November 10 arrives as 200 at 06:00 and 200 at 14:00. Whether the time is a ship time or a dock arrival time follows BSS04.

REF: Dock and Line References

REF*DK*DOCK 7~ names the receiving dock. Plants also use REF in the LIN loop for line-feed locations, storage locations or kanban numbers, with qualifiers set in their guide.

SHP: Shipped/Received Information

SHP*01*400*050*20261105~
SHP*02*42200*051*20260105**20261105~
ElementNameExampleMeaning
SHP01Quantity Qualifier0201 discrete, 02 cumulative
SHP02Quantity42200The quantity
SHP03Date/Time Qualifier051050 received, 011 shipped, 051 cumulative start
SHP04Date20260105The date, or the cumulative start date
SHP06Date20261105Cumulative end date

The plant last received 400 on November 5 and has received 42,200 cumulative since January 5. If that does not match your shipped cumulative, find the difference before you ship. Parts still in transit are not in the plant's received total yet, so they explain part of any gap; anything beyond that needs a call to the plant's scheduler. For the full reconciliation, see cumulative quantity and CUM accounting.

SDP: Ship/Delivery Pattern

Some plants send a routine pattern instead of, or as well as, exact dates: SDP*O*D~ reads "daily, Monday to Friday, mornings". The codes are the same as on the 830.

CTT: Transaction Totals

CTT*1*1600~ reports one LIN item and FST quantities that add up to 1,600. Check it on receipt; a mismatch means a bucket went missing.

Where the 862 Sits in the Order Lifecycle

In a blanket-PO, just-in-time manufacturing relationship, the 862 is the trigger to ship:

  1. Blanket 850 Purchase Order: the buyer establishes the agreement, pricing and item list
  2. 830 Planning Schedule: rolling forecast, firm releases and authorizations
  3. 862 Shipping Schedule: exact near-term ship or delivery requirements
  4. 866 Production Sequence (sequenced parts only): the build order
  5. 856 Ship Notice/ASN: you report each shipment, quoting the release and PO
  6. 810 Invoice: you bill against the blanket PO

A late or misread 862 ripples straight into the ASN and the delivery itself, which is why supplier schedulers watch it closely.

Common 862 Errors and How to Prevent Them

ErrorWhat happensPrevention
Replace (05) loaded as an additionDuplicate requirements, parts shipped twiceClear the horizon for that part and ship-to before loading a 05
Delivery dates read as ship datesArrivals late by the transit timeCheck BSS04 and offset by lane transit time
JIT times ignoredWhole day's quantity arrives at one time; dock refuses or line runs shortLoad JIT times into dispatch, not just daily totals
Cumulative out of syncOver- or under-shipment against the plant's countReconcile SHP against your shipments on every 862
Shipping beyond the 830's authorizationParts the buyer is not committed toFlag any 862 that exceeds the 830 firm and ATH quantities
Wrong release or PO on the ASN856 rejected or receipt unmatchedCarry BSS07 and BSS10 through to the 856
Stale scheduleShipping to yesterday's requirementAlert when the expected daily 862 has not arrived

862 Implementation Checklist

  • Get the plant's 862 guide and confirm the X12 version
  • Confirm BSS01 purpose codes and whether every 862 replaces the last
  • Confirm BSS04 (delivery or ship dates) and BSS11 (discrete or cumulative)
  • Confirm FST02 and FST03 codes, and whether it sends JIT times or SDP patterns
  • Confirm the references it expects back on your 856 (release, PO, dock)
  • Agree the cumulative start date and how SHP is reported
  • Test a replace, a cancellation and a JIT schedule before going live
  • Monitor 997s and alert on missing schedules

Reading 862s With OrderSync

Paste any 862 into the free EDI inspector to see it parsed segment by segment, with a plain-English summary of each day's firm quantity, the JIT delivery times under it, and the cumulative received. It also explains structural errors when a file will not load.

OrderSync's main work is on the orders around your schedules. Suppliers who ship to an OEM on 830s and 862s usually also take POs from aftermarket, distribution and smaller industrial customers as 850s, emails, PDFs and spreadsheets. OrderSync reads those in any format, matches customers, items and units to your catalog, and outputs valid X12 or clean data for your ERP. Read more about EDI for automotive parts suppliers and contract manufacturers, or book a 15-minute walkthrough.

Frequently Asked Questions

What is the difference between EDI 862 and EDI 830?

The 830 Planning Schedule carries longer-range demand, with firm and planning buckets and ATH authorizations for material and labor. The 862 Shipping Schedule is a near-term instruction for exactly what to ship and when. The 862 supplements the 830; it does not replace it or authorize resources on its own.

Does an EDI 862 carry forecast quantities?

It is meant for firm near-term requirements. Some partners add a short planning look-ahead using the same FST codes as the 830, so check FST02 on every bucket. Forward forecast and material authorization belong in the 830.

What is the BSS segment in an EDI 862?

BSS is the 862 header. It carries the purpose code, the schedule number and date, whether dates are delivery or ship dates, the horizon start and end, and the references that tie the schedule to its release, its 830 forecast and its blanket purchase order.

What is the JIT segment in an EDI 862?

JIT follows an FST bucket and splits its quantity by time of day: a quantity and a 24-hour time. It lets a plant ask for 200 parts at 06:00 and 200 at 14:00 on the same day.

What is the difference between EDI 862 and EDI 866?

The 862 says how many parts to deliver and when. The 866 Production Sequence says the order in which individual parts must arrive, tied to the vehicles or jobs on the line. Sequenced suppliers often receive both.

What is the EDIFACT equivalent of the 862?

DELJIT, the UN/EDIFACT Delivery Just In Time message. DELFOR corresponds to the 830 in the same way.

Who uses the EDI 862 Shipping Schedule?

It is most common in automotive and other just-in-time manufacturing supply chains, where OEM and Tier 1 plants call off daily or intra-day deliveries against a blanket purchase order.