Skip to content
EDI DELFOR — EDI TransactionPublished Nov 7, 2026

EDIFACT DELFOR: Delivery Schedule Guide

EDIFACT DELFOR explained: firm and forecast SCC codes, cumulative quantities, Global DELFOR on D.04A, VDA 4905 and 4984, a full example and the X12 830 map.

DELFOR is the message that tells an automotive or industrial supplier what to build, and how much of that plan the customer will actually pay for if it changes. Every week, often every day, the customer's MRP run produces a new schedule per part. The supplier's job is to read each bucket correctly: ship the firm ones, plan around the forecast ones, and never build beyond what the customer has authorised.

This guide covers what DELFOR carries, the directories you will meet (D.96A and D.97A in older OEM guides, D.04A in the current Global DELFOR), how VDA 4905 and 4984 fit in, a full example, the segments you will map, and how DELFOR lines up with the EDI 830 planning schedule.

What Is an EDIFACT DELFOR?

DELFOR is the UN/EDIFACT Delivery schedule message: "a message from buyer to supplier giving product requirements regarding details for short term delivery instructions and/or medium to long term product/service forecast for planning purposes according to conditions set out in a contract or order." That is the definition in the UN/EDIFACT directory, which adds that the message "can be used to authorize the commitment of labour and materials resources." It is often called the delivery forecast, and the 830 and 862 guides on this site use that name too, but its official title is the delivery schedule message.

Authoritative references for DELFOR work:

Who sends it? The buyer: an OEM, a tier-one supplier ordering from its own suppliers, or any manufacturer running scheduling agreements. It is usually generated by the plant or the central planning system.

When is it sent? On a fixed cadence, most often weekly and sometimes daily, straight out of the buyer's MRP run. Each new DELFOR normally replaces the previous schedule for the same part, ship-to and delivery point.

Why does it matter? DELFOR drives your production planning and raw-material buying. Misreading a forecast bucket as firm leads to overproduction. Missing a firm bucket leads to premium freight or a line stoppage at the customer.

Directories: D.96A, D.97A and D.04A

DELFOR has changed shape between directories, and the directory in UNH tells you which layout you are reading.

DirectoryWhere you meet itShape of the detail section
D.96AOlder OEM and supplier guidesUNS separates header and detail; detail is grouped either by delivery point or by product
D.97ASome OEM and supplier guidesGIS opens each delivery-point group; no UNS
D.04AGlobal DELFOR (Odette's joint automotive guideline and VDA 4984)GEI opens each delivery-point group; no UNS

Volvo Group's guide describes its current profile as "the Joint Automotive Industries (JAI) Global DELFOR. Based on EDIFACT Directory, D04A", and lists the differences from its older D.96A message. The VDA's own recommendation, VDA 4984, is also a Global DELFOR on D.04A. That is why the example in this guide uses D.04A rather than the D.96A used elsewhere on this site. If your customer still runs a D.96A or D.97A profile, the business content is the same; the grouping segments differ.

Odette, VDA and the Flat Files DELFOR Replaced

European automotive EDI grew up on two families of guidelines: Odette, the pan-European automotive organisation, and the VDA, the German automotive association. The VDA list of recommendations records how the old VDA flat files map to the EDIFACT messages that replace them:

Old VDA recommendationWhat it carriedReplaced byStatus in the VDA list
VDA 4905 (April 1996)Delivery schedules (Lieferabrufe), flat fileVDA 4984 Global DELFOROutdated, still used occasionally
VDA 4915Detailed JIT call-offs (Feinabrufe), flat fileVDA 4984 (delivery schedules with DELFOR) and VDA 4985 (JIT call-offs with DELJIT)Still widely used
VDA 4916Production-synchronous call-offs, flat fileVDA 4986 (JIS call-offs with DELJIT)Still widely used

So a German OEM moving off VDA 4905 will send you DELFOR, and one moving off VDA 4915 will send DELFOR for the plan and DELJIT for the near-term calls. Many suppliers receive both the old flat file and the new message during a migration, so confirm with the customer which one is authoritative.

Firm, Commitment and Forecast: the SCC Codes

Every quantity bucket in DELFOR sits under an SCC (scheduling conditions) segment whose first element says what kind of demand it is. The UN/EDIFACT code list for that element (delivery plan status indicator, 4017) defines:

SCC codeMeaningWhat the supplier does
1FirmShip it on the date given
2Commitment for manufacturing and materialBuild it: the customer authorises production
3Commitment for materialBuy the material for it, but do not build yet
4Planning/forecastPlan capacity only; it can change in the next schedule

Codes 2 and 3 are the EDIFACT version of the X12 830's ATH segment: they set the fabrication and raw-material authorisation the customer is liable for. Our article on cumulative quantity (CUM) accounting covers how these zones work against the cumulative totals.

Example: Weekly Global DELFOR for One Part

The fictional axle plant Northbrook Axle (buyer code 0410) sends its weekly schedule to the fictional foundry Kestrel Castings (supplier code 4471) for one cast brake carrier. Two weeks are firm, three are forecast, and the message authorises fabrication to 29 November and material to 13 December.

Live exampleEDIFACT DELFORGlobal DELFOR D.04A (Odette/VDA profile)

Weekly delivery schedule for one part

Two firm weeks (SCC+1), three forecast weeks (SCC+4), the buyer's cumulative received quantity and last receipt, and fabrication and material commitments (SCC+2 and SCC+3).

Structurally valid UN/EDIFACT
UN/EDIFACT · DELFOR · D:04A:UN · 47 segments · 1 message

DELFOR · Delivery schedule · ref 1

Document
241
Document number
NB-DF-261106-01
Message function
Original
Document/message date/time
2026-11-06
Date (157)
2026-11-09

Parties

RoleIdentifierName and address
Buyer BY0410Assigned by buyer-
SE SE4471Assigned by buyer-
Ship to ST0410Assigned by buyer-

Lines (1)

#GTINCodesDescription70PriceAmount
-
Supplier: KC-88120
Buyer: 7731-220-04
-18400--

Interchange (UNB)

Sender
NBAXLE0410Mutually defined
Recipient
KESTRELCASTMutually defined
Prepared
2026-11-06 23:00
Control reference
NBD0000317
Syntax
UNOC version 3
Messages
1

Reading it as the supplier's planner would:

SegmentWhat it says
BGM+241+NB-DF-261106-01+9'Delivery schedule (241), number NB-DF-261106-01, original (9)
DTM+137 / DTM+157Issued 6 November; valid from 9 November
NAD+BY / NAD+SEBuyer and seller, by codes the buyer assigned (92)
GEI+3' then NAD+STStart of the detail for ship-to plant 0410. Volvo's guide calls GEI+3 the section separator
LIN / PIAThe buyer's part number (IN) and your own part number (SA)
LOC+11+D07::92'Unloading point: dock D07
RFF+ON / RFF+AIFThe scheduling agreement or order, and the previous schedule this one replaces
QTY+70:18400' with DTM+51 and DTM+5218,400 received since 5 January, up to 6 November
QTY+48 / DTM+50 / RFF+AAKThe last receipt the buyer booked: 1,200 on 4 November against despatch advice KC-ASN-30982
SCC+1 bucketsFirm: ship 1,200 on 11 November and 1,200 on 18 November
SCC+4 bucketsForecast: 1,400, 1,400 and 1,000 for the following three weeks
SCC+2 / QTY+1:3800'You may manufacture up to 3,800 between 9 and 29 November
SCC+3 / QTY+1:6200'You may buy material for up to 6,200 between 9 November and 13 December

The fabrication commitment covers the two firm weeks plus the first forecast week (1,200 + 1,200 + 1,400 = 3,800). The material commitment covers all five weeks (3,800 + 1,400 + 1,000 = 6,200). Check that arithmetic on your partner's real schedules: when an authorisation is lower than the firm buckets it covers, that is a question for the scheduler, not something to resolve in your ERP.

Note there is no UNS and no CNT in a D.04A DELFOR: the last bucket is followed directly by UNT. The free EDIFACT inspector checks the UNT and UNZ counts for you.

DELFOR Structure at a Glance (D.04A)

AreaSegment or groupStatusWhat it holds
HeaderUNHMMessage reference and type DELFOR:D:04A:UN
HeaderBGMMDocument code (241), schedule number, function
HeaderDTMMMessage date; validity dates
HeaderFTXCFree text
HeaderRFF group (SG1)CReferences for the whole message
HeaderNAD group (SG2)CBuyer, seller, other parties, with contacts
HeaderTDT group (SG5)CTransport details
DetailGEI group (SG6)COne group per delivery point and its parts
DetailNAD (SG7)CShip-to or delivery point for this group
DetailLIN group (SG12)COne part: PIA, IMD, LOC, DTM, RFF
DetailQTY group (SG16)CCumulative, received, in-transit and backorder quantities
DetailSCC group (SG18)CScheduling condition, then its QTY and DTM buckets
DetailPAC group (SG21)CPackaging requirements
TrailerUNTMSegment count and message reference

Statuses are from the UN/EDIFACT D.04A message. Automotive guidelines make many of the conditional groups required.

Key Segments Explained

BGM: Beginning of Message

BGM+241+NB-DF-261106-01+9'
ElementNameExampleNotes
1001Document name code241Delivery schedule. Some guides allow other codes for a forecast-only schedule; follow your partner's list
1004Document identifierNB-DF-261106-01The schedule number. Later messages quote it in RFF+AIF
1225Message function code9Original. Your partner's guide says whether it also sends replacements or changes

DTM: Dates

DTM+137:20261106:102'
Qualifier (2005)MeaningWhere
137Document/message dateHeader
157Validity start dateHeader
257Calculation dateLine
51 / 52Cumulative quantity start and end dateWith QTY+70
50Goods receipt dateWith QTY+48
10Shipment date requestedWith a schedule bucket
2Delivery date requestedWith a schedule bucket, when the partner schedules by delivery
194 / 206Start and end of a periodWith commitment quantities

Format 102 is CCYYMMDD and 203 is CCYYMMDDHHMM. Whether buckets carry a ship date (10) or a delivery date (2) is set by the partner, and confusing the two moves every shipment by the transit time.

LIN, PIA and LOC: The Part and Where It Goes

LIN+++7731-220-04:IN'
PIA+1+KC-88120:SA'
LOC+11+D07::92'

The third element of LIN carries the buyer's part number with type IN. PIA with function 1 adds other numbers, here your own part number (SA); some OEMs also send a drawing or engineering change level here. LOC+11 is the place of discharge, usually the dock or unloading point, and some guides add LOC+159 for a further internal destination. In Volvo's guide, the combination of part, order number, unloading point and parties is what identifies a schedule, so a change to any of them starts a new schedule rather than updating the old one.

QTY: Cumulative and Receipt Quantities

QTY+70:18400'
DTM+51:20260105:102'
DTM+52:20261106:102'
Qualifier (6063)Meaning
70Cumulative quantity received
48Received quantity (the last receipts, each with DTM+50 and RFF+AAK)
57In transit quantity
83Backorder quantity
113Quantity to be delivered (inside an SCC group)
1Discrete quantity (used with SCC+2 and SCC+3 commitments)

Compare the buyer's QTY+70 with your own shipped cumulative every time. If they differ, the difference is usually a shipment in transit or a receipt the buyer has not booked, and the QTY+48 lines tell you which despatch advices the buyer has counted.

SCC: Scheduling Conditions

SCC+1'
QTY+113:1200'
DTM+10:20261111:102'

Each SCC opens a group, and every QTY and DTM pair under it inherits its status. A message can repeat SCC+1 once per firm bucket, as in the example, or carry several QTY/DTM pairs under one SCC; both shapes are valid, so your mapping should handle both. Some profiles add a later element to flag the delivery process: Volvo uses SCC+4++J' to mark a forecast for a part delivered through a JIT or JIS flow.

DELFOR vs the X12 830

DataEDIFACT DELFORX12 830
MessageDELFOR830 Planning Schedule with Release Capability
Schedule number and typeBGMBFR
Horizon datesDTM+157, and dates per bucketBFR start and end dates
PartiesNAD+BY, NAD+SE, NAD+STN1 loops
Part numberLIN (IN) and PIA (SA)LIN with BP, VP and other qualifiers
Unloading pointLOC+11N1 or REF per partner
Firm vs forecastSCC code 1 or 4FST02 code C or D
Fabrication and material authorisationSCC+2 and SCC+3 with a quantity and periodATH
Cumulative receivedQTY+70 with DTM+51/52ATH or SHP per partner
Last receiptsQTY+48, DTM+50, RFF+AAKSHP and REF
Trailer countUNTSE

The two do the same job, but the mapping is not one-to-one, so treat a DELFOR-to-830 conversion as a remap built from the partner's guide. The 830 guide covers the X12 side, and EDI 830 vs 862 explains how planning and shipping schedules divide the work.

Where DELFOR Sits in the Flow

StepMessageDirectionX12 equivalent
1Scheduling agreement or blanket order (often outside EDI)Buyer to supplier850
2DELFORBuyer to supplier830
3DELJIT, when the plant calls off in more detailBuyer to supplier862 or 866
4DESADVSupplier to buyer856
5INVOIC, or self-billing by the buyerEither810

The scheduling agreement sets prices and terms once; DELFOR then drives quantities. Our article on scheduling agreements vs blanket orders explains that structure, and many automotive buyers pay by self-billing from your DESADV instead of waiting for an invoice.

Common DELFOR Errors and How to Prevent Them

ProblemWhat happensPrevention
Forecast buckets loaded as firmOverproduction and excess stockMap each SCC code explicitly; never default an unknown code to firm
New schedule added to the old one instead of replacing itDemand doubles in your MRPReplace by the key the partner defines (part, order, unloading point, parties)
Ship date read as delivery date, or the reverseEvery shipment early or late by the transit timeCheck whether buckets use DTM+10 or DTM+2
Cumulative mismatch ignoredShortages or overshipments build up quietlyReconcile QTY+70 with your shipped cumulative on every schedule
Wrong directory assumedParser fails or groups are misreadRead the version in UNH and keep one map per partner profile
Commitments ignoredMaterial bought with no authorisation behind itLoad SCC+2 and SCC+3 into planning as limits
Zero schedule not handledOld demand stays open after a part or order changesTreat a zero-quantity schedule as a cancellation of that key

DELFOR Implementation Checklist

  1. Get the partner's profile. Directory (D.96A, D.97A or D.04A), Odette or VDA basis, and any OEM-specific codes.
  2. Agree identifiers. Your supplier code in NAD+SE, the plant and dock codes in NAD+ST and LOC, and both part numbers.
  3. Confirm the replacement key. Which combination of part, order, unloading point and parties identifies one schedule.
  4. Map every SCC code the partner uses, including any JIT or JIS flags in later elements.
  5. Decide ship-date or delivery-date planning from the DTM qualifiers.
  6. Load cumulative quantities and set an alert when the buyer's QTY+70 differs from yours.
  7. Load commitments as fabrication and material limits in planning.
  8. Test with real schedules, including a zero schedule, a part change and a cumulative reset at year end.

Reading DELFOR With OrderSync

DELFOR is a planning message, and most suppliers receive it alongside orders that arrive in other ways: EDI 850s from some customers, PDFs and emails from others, and spreadsheets from the rest. OrderSync reads those inbound orders in any format, matches customers, items and units to your catalog, and outputs clean ERP data or valid X12, and it generates the outbound 856 ship notice and 810 invoice your US customers expect.

Paste any DELFOR into the free EDIFACT inspector to see it parsed segment by segment, use the free EDI inspector for the X12 830s and 862s from your US customers, or book a 15-minute walkthrough to see your own orders processed.

Frequently Asked Questions

What is the X12 equivalent of DELFOR?

The 830 Planning Schedule with Release Capability. Both carry firm and forecast quantities per part over a rolling horizon, and both can authorise fabrication and material. DELJIT is the EDIFACT counterpart of the 862 shipping schedule.

What does SCC+1 mean in DELFOR?

SCC is the scheduling conditions segment and code 1 means firm. The quantities and dates that follow are committed call-offs to ship. Code 4 means planning or forecast, while 2 and 3 authorise manufacturing and material purchases.

Which directory does DELFOR use?

It depends on the partner. Older OEM guides use D.96A or D.97A. The Global DELFOR published for the joint automotive industry, and VDA 4984 in Germany, use D.04A. The version in the UNH segment tells you which layout you are reading.

What is VDA 4984?

VDA 4984 is the German automotive association's recommendation for delivery schedules in EDIFACT, a Global DELFOR based on D.04A. The VDA lists it as the replacement for the VDA 4905 flat file and, together with VDA 4985 for DELJIT, for VDA 4915.

Does DELFOR have a UNS segment?

In D.96A, yes: UNS separates the header from the detail. In D.97A and D.04A it does not; the detail starts with GIS or GEI groups instead. Sending a UNS in a D.04A message will usually fail validation.

What is QTY+70 in DELFOR?

QTY+70 is the cumulative quantity received by the buyer, with its start date in DTM+51 and usually its end date in DTM+52. Suppliers reconcile it against their own shipped cumulative to catch missing receipts or shipments still in transit.

Is DELFOR used outside automotive?

Yes. Any manufacturer running scheduling agreements can use it, and DELFOR is part of the GS1 EANCOM subset as well. Automotive is where suppliers meet it most, under Odette and VDA guidelines.

Related guides

Sources

Check any DELFOR or DELJIT in the free EDIFACT inspector.

James Darby
Last updated: 11/7/2026

Related Resources