The Order-to-Invoice Cycle in EDI
A retailer's 850 starts a sequence the supplier has to finish on time. Most compliance problems come from the replies, not the order: an 855 that arrives late, an 856 that does not match what is on the truck, or an 810 that bills a quantity the ASN never shipped. The three documents have to agree with each other and with the PO.
- 855 acknowledgment, usually within 24 to 48 hours. Confirm each line or say what changes. 855 guide
- 856 ship notice, sent when the order leaves and before it arrives. Each carton gets an SSCC that matches its GS1-128 label. 856 guide
- 810 invoice, billing what shipped at the agreed price, with the PO number and terms. 810 guide
Check the Drafts Before You Send Them
The builder gets the structure and the arithmetic right. These are the things only you can confirm:
- Envelope IDs. The ISA sender and receiver IDs and qualifiers must be the ones your partner set up, and ISA15 must be T while you are testing and P once you go live.
- What really shipped. Edit the 856 to match the cartons on the truck, not the order. Every SSCC in it must be on a printed label, and the carton count in TD1 must match the pack loops.
- Carrier references. The SCAC in TD5 and the bill of lading number in REF*BM should match the paperwork the driver signed. The bill of lading generator and SSCC label generator produce both from the same details.
- Terms and timing. The 810 should carry the payment terms on the PO, and go out after the 856, never before it. Some retailers hold or reject an invoice that arrives ahead of its ship notice.
If a partner rejects one of them with a 997 or 824, the EDI rejection explainer says what went wrong and where. After sending, check the replies line by line with Compare EDI documents, keep a readable copy with the EDI to PDF converter, and see what each retailer expects in the retailer EDI requirements. If you trade with a handful of retailers through a portal, agent-run web EDI is the next step.